Our projects
Nawalpur District
Nepal Electricity Authority
Electrical Works
completed
The Construction of 33 kV Transmission and Substation Works for Nawalpur Rural Electrification and Chusang (Mustang) is a project undertaken under a contract between the Nepal Electricity Authority (NEA) and BP–Paramount Joint Venture, in which Paramount Construction is the 100% active partner.
Under this project, comprehensive works have been carried out for the design, supply, installation/erection, testing, and commissioning of the rural distribution network in Nawalpur District. The scope of work includes the construction of approximately 110 circuit-kilometers (ckt-km) of High Tension (HT) line and approximately 150 circuit-kilometers (ckt-km) of Low Tension (LT) line.
In addition, the project involved the supply and installation of more than 45 distribution transformers of various capacities. These installations aim to strengthen the rural electricity infrastructure and ensure reliable and efficient power delivery across the targeted areas.
Telecom and Transmission Line
industry
Buildings and Prefab
Bridges and Road