Bhujung Khola ,Pokhara Kaski District
Vision Lumbini Urja Company Limited
Hydro Mechanical Works
completed
The Seti Nadi Hydroelectric Project in Kaski District, with an installed capacity of 25 MW, included the design, supply, installation, testing, and commissioning of radial gates and monorail hoisting structures. A fully automated SCADA system was deployed to operate 26 gates with manual, semi-automatic, and fully automatic modes. The project also included the complete design, fabrication, erection, and commissioning of 11269 meter of steel penstock pipes, executed in accordance with engineering standards. This project was successfully completed in collaboration with Dawn Hydro Mechanical Works Pvt. Ltd.