Plant & Design Built Contact Of Hydromechanical Works Of Sedi Nadi Hydroelectrical Project 25MW

Bhujung Khola ,Pokhara Kaski District

Client

Vision Lumbini Urja Company Limited

Market

Hydro Mechanical Works

Project Status

completed

The Seti Nadi Hydroelectric Project in Kaski District, with an installed capacity of 25 MW, included the design, supply, installation, testing, and commissioning of radial gates and monorail hoisting structures. A fully automated SCADA system was deployed to operate 26 gates with manual, semi-automatic, and fully automatic modes. The project also included the complete design, fabrication, erection, and commissioning of 11269 meter of steel penstock pipes, executed in accordance with engineering standards. This project was successfully completed in collaboration with Dawn Hydro Mechanical Works Pvt. Ltd.

Gallery

Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image

Together,
We Make It Happen

Telecom and Transmission Line

industry

Buildings and Prefab

Bridges and Road